SOAPP-CT.25FeaturesBill of Materials and Capital Cost EstimateSOAPP-CT.25 calculates project-specific equipment sizes and material quantities and estimates costs using sensitive cost models. SOAPP-CT.25 generates a detailed Equipment List Report and a Capital Cost Breakdown Report, including a detailed Bill of Materials and cost breakdowns by account. |
||||||
| Copyright
© 1999 SOAPP, LLC SOAPP is a registered trademark of EPRI (Electric Power Research Institute, Inc.). Products contain EPRI Technology.
Last modified: Friday, July 19, 2002 |
||||||