SOAPP-CT

Features

Integrated Financial Analysis

SOAPP-CT estimates fuel costs and annual fixed and variable O&M costs based on the Conceptual Design Input, Heat and Material Balances, and Equipment Design. SOAPP-CT then develops a Capital Outlay Schedule and a Pro Forma Income and Cash Flow Statement (or, for regulated utilities, a Revenue Requirements Analysis) for your project. You have the option to either enter electricity and capacity price forecasts or schedules and have the WorkStation solve for project return on equity, or enter the return on equity you require and have the WorkStation derive the electricity and capacity prices needed by your current project design in order to satisfy your requirement.

SOAPP-CT's seamless integration of the project Financial Analysis and Cash Flow with the Heat Balances, Equipment Design, and Project Schedule that drive these analyses allows you to see the relative impact to your project's bottom line of even the slightest changes to your Conceptual Design Input. You can use this powerful capability to target your project design simultaneously to project financial requirements, market uncertainties, site conditions, and fuel and consumable prices.

 to Project-Specific Capital Cost Estimates

Return to Features Overview

to Fast Sensitivity Analysis


Careers | Contact Us | Copyright Policy | Privacy Statement | Terms of Use 

800.313.3774 or 650.855.2121
EPRI 3420 Hillview Avenue, Palo Alto, California 94304
© Electric Power Research Institute, Inc. 2001- All rights reserved