SOAPP-CT

Features

Project-Specific Capital Cost Estimates

SOAPP-CT builds project-specific plant construction cost estimates from sensitive cost models correlating costs to the project-specific equipment sizing calculated in Equipment Design. Total plant construction cost estimates generated by SOAPP-CT include:

  • 45 plant components
  • 15 category breakdown provided for each plant component
  • 3 elements (equipment, materials, labor) provided for each breakdown category
  • 12 major commodities summarized by total quantity

Five adjustment factors for each of 45 plant components, provided in Conceptual Design Inputs, enable you to calibrate SOAPP-CT's costing models according to regional differences, market conditions, and your design practices.

All Capital Cost Estimates produced by SOAPP-CT are generated dynamically, reflecting every relevant change you make to your project Conceptual Design Input. SOAPP-CT's engineering-driven cost models, and their seamless integration with the Heat Balances and Equipment Design, allow you to see the impacts of even the slightest changes to your Conceptual Design Input propagate throughout the estimated Total Plant Investment for your project.

 to Site Plans

Return to Feature Overview

to Integrated Financial Analysis


Careers | Contact Us | Copyright Policy | Privacy Statement | Terms of Use 

800.313.3774 or 650.855.2121
EPRI 3420 Hillview Avenue, Palo Alto, California 94304
© Electric Power Research Institute, Inc. 2001- All rights reserved