Project-Specific Capital
Cost Estimates
SOAPP-CT builds project-specific plant construction cost estimates from
sensitive cost models correlating costs to the project-specific equipment
sizing calculated in Equipment Design. Total plant construction cost
estimates generated by SOAPP-CT include:
- 45 plant components
- 15 category breakdown provided for each plant component
- 3 elements (equipment, materials, labor) provided for each breakdown
category
- 12 major commodities summarized by total quantity
Five adjustment factors for each of 45 plant components, provided in
Conceptual Design Inputs, enable you to calibrate SOAPP-CT's costing
models according to regional differences, market conditions, and your
design practices.
|

All Capital Cost Estimates produced by SOAPP-CT are generated
dynamically, reflecting every relevant change you make to your
project Conceptual Design Input. SOAPP-CT's engineering-driven
cost models, and their seamless integration with the Heat Balances
and Equipment Design, allow you to see the impacts of even the
slightest changes to your Conceptual Design Input propagate
throughout the estimated Total Plant Investment for your project. |
|
|